Material Requirements

STEPS

FILLERS

Installation

STEP 1

Place one step and two full fillers as shown

STEP 2

Place second step with an approximate ½”-1” overlap

STEP 3

Cut one filler into two equal pieces and place it behind the second step.

STEP 4

Place the third step with a ½” 1” overlap